This site was originally bought by our client through auction having had the basement and retaining walls already constructed by the previous builder who unfortunately ran out of money.
Lots of investigation took place to establish that what had been constructed is to a standard that the selected builder could continue with.
4mation were appointed to produce building Regulation drawings, remove planning conditions and supervise the works on site.
The property took 12 months to construct and was completed in 2012.